Dries to touch in 24 hours at 77 f and 50 humidity.
Roll roofing adhesive dry time.
Apply latex bonding adhesive to the substrate using a large thick nap paint roller.
Most types of rolled roofing materials can be applied directly to the roof deck.
As a replacement for hot asphalt in built up roofing bur applications henry 203 roll roofing adhesive is designed for bonding layers of asphalt coated base sheets.
Allow for a minimum of 28 day cure period for granule surfaced membranes that are adhered in oleum roll roofing adhesive prior to the application of rust oleum roof coatings.
Apply adhesive evenly and uniformly with full coverage between each layer.
Spread a sufficient layer of adhesive so the roof surface is completely covered.
Environmental or site specific conditions will vary cure time.
If the roof is sloped you can use the exposed nail method.
Applying roofing felt first will better protect the sheathing against condensation as well as against leaking.
After adhesive is applied a few minutes of open time will accelerate curing time.
Some have a paper back that is peeled away to allow the material to adhere directly to the roof deck others require an adhesive to be applied to the roof first and then the material is rolled into.
Apply when surface tem.
Henry company roll roofing adhesive 128 fl oz roof adhesive.
For a slightly sloped roof use the concealed nail method shown.
Henry 203 roll roofing adhesive is a premium brush or squeegee grade waterproof adhesive made from asphalt solvents and organic fibers.
I ve never used this stuff before so any help.
Item 621251 model he203142.
Container to lap ends of selvedge mineral surfaced roll roofing owenscorning 2 1 2 days ago and it still has a wet consistency when i lift a lap end.
Apply on a clear warm day with no rain forecasted for 24 36 hours.
Roll the epdm membrane into the wet adhesive.
One of the advantages of using roll roofing is the installation.
He203 roll roofing adhesive is suitable for application with a notched squeegee or 4 knot roofing brush.
Some homeowners choose to apply msr on their home rooftops and those that do can use it to re roof over an already existing roof but it has to carefully prepared ahead of time with the removal of any debris gravel or residue from the previous roof covering to keep from damaging or puncturing the rolled roofing.
Full cure is achieved in 1 week.
Stir adhesive to uniform consistency before using.
Roll roofing is often installed over bare wood sheathing or sheathing that has been painted with a primer.
Then using a stiff bristled push broom apply sweeping pressure to ensure a smooth application of the membrane.