Above the bottom edge.
Placing shaker siding at top of peak.
Nail the starter strip to the siding aligning the top of the strip with the chalk line.
Once it is in place test by sliding the last piece back and forth slightly.
Put the bottom step flashing on the starter course then bend the bottom of the step flashing out about 1 to 1 away from the wall.
Be sure the top and bottom click into place.
Align one of the vertical edges at the edge of the trim or.
You do have to trim the top starter course shingle with a triangle shaped cut to allow this.
Check out these seven design ideas for shake siding to help uncover the next look for your home.
On a wall to be covered with wood cement board vinyl or metal siding the step flashing and associated roofing must be installed first so the siding can cover the top of the step flashing on.
Align the thick lower edge of a cedar shake at the lower edge of the siding or shear wall.
The top of the step flashing is still under the siding or plaster.
Shake siding design ideas.
Attach the siding with 10d galvanized box nails driven into the overlap at least 1 2 in.
One of the reasons that shake siding is so popular is the way that it can give your home a rustic or retreat style r look.
It should move smoothly.
Nail vertical vinyl corners to the corners of the house making sure they are plumb.
Start your siding at those points doing 3 4 rows at a time and use the level reference line to keep you straight.
These classic vinyl siding colors deliver curb appeal for years boost your home s curb appeal with one of these gorgeous vinyl siding hues from classic neutrals to trendy bold.
When you replace the boards use a homemade reveal set jig to match the reveal of the existing siding.
Push up gently until you hear a click.
Installing vinyl shake siding.
Affix attachments every 6 8 inches to allow the siding to be flexible enough to expand and contract with heating changes.
The courses should overlap by at least 1 in.
Ok no problem simply still create a level line that is higher than the peak of the garage roof decide where you want the siding to start and measure down from the level line equal distances at the back and front of garage roof.
Start at the bottom of the wall at one end.
Pop a level chalk line for the starter strip an inch or two above the bottom of the siding.